December 10, 2019
A Georgia federal judge has increased the damages awarded to a chemical company over an engineering firm's flawed factory designs to $2.76 million, saying he was wrong about the contract-based liability cap he had put in place before their September trial and that the manufacturer was owed another $550,000.